As long as the water is not up to the overflow there is no problem. Make sure the softener is placed on a level surface - you don't want to have to move the softener after it's full of water, so choose the location carefully. You can also use the contact us link above to connect you to one of our technical experts. If soldering, first solder a short (min 3-inch [7.6-cm]) piece of copper pipe onto the adapters, away from the valve, before connecting the adapter to the system fittings. Cold water will be soft instantly, but remember that your hot water tank still contains hard water and it can take a while for this to be flushed through. Add the result to the hardness in GPG, and this is your compensated hardness. Inspect all parts for damage and report any damage immediately. Compression Fitting You can usually hear the faint hum of the motor, or feel it through the control head, you may have to wait to see if the time dial keeps track of time. It has a high water softening capacity, enough for families of up to 6 people. If your water pressure is good, a drain line can be run horizontally for 45 feet without issue. Most installers use clear vinyl tubing available at every hardware store, Gear clamp - image below - for securing the drain line to the drain line barb, collecting the tools and supplies for the job, determining the best spot to put your softener, connecting some components to the softener, programming the control valve for your water conditions, adding salt and doing the first regeneration, discharge the drain line outdoors to a pit, swale, or lawn, attach the drain line directly to a household drain pipe, make sure the drain line isn't kinked, bent, or twisted, make sure the drain line cannot ever freeze, the open end of the drain line must be secured or else the force of discharging water may cause it to move, if discharging to a floor drain or other drain, make sure you leave an air gap (a separation between the end of the drain tube and the standing level of the water), the drain line can be elevated a few feet above the height of the softener without impairing performance, if your water pressure is good a 45' horizontal drain line run is fine. If you have iron or manganese in the water you will need adjust the hardness to compensate. Your softener will have a drain line used to discharge waste water when the softener regenerates. FLECK 5600SXT Upflow Service Manual. This is fine, and when screwing on the control head just ensure the riser feeds into the pilot hole and it will correct itself. A white arrow will point at the current gallon capacity remaining. Most systems will ship loaded. The display will normally flash between the current time and the number of gallons remaining until regeneration. Service. It will hold just over 200 pounds. Tips, tricks, and recommendations will be shown here Do not worry if you are unable to use the overflow fitting, it is a third backup (after programming and the float). But I've looked at them all to boil it down to the HARD FACTS of why it's 100% WRONG for you. We recommend the pelleted softener salt as it tends to have fewer issues with solidifying and bridging. Configures the system as a standard downflow system with regeneration (salt) feed. FLECK 5600SXT Downflow Service Manual. Some may come with one for the bottomw as well, but it is not needed. Covers standard water softeners using a separate brine tank. Please Note: Digital systems only With the brine tank empty the system will not draw water out of the brine tank during the brine draw cycle. Do not overtighten the screws on your system. This is what connects to your control head and provides standard fitting connections to hook up to your plumbing. Page 1 FLECK 5600SXT DOWNFLOW SERVICE MANUAL www.pentairaqua.com ... STARTUP INSTRUCTIONS CONTINUED Setting the Time of Day 1. If the brine tank on your Fleck 5600SXT-based softener isn't being drained during the regeneration of your softener, two things will happen: Your softener won't regenerate properly and your water will be hard Your brine tank will fill with water over time, until the safety float is engaged When customers contact us tha You can run a manual regeneration and watch the brine tank during the brine draw cycle (BD on digital valves) to ensure the water is being drawn out of the tank, and during the brine fill (BF on digital) watch to see if water is coming out around the fitting. Unscrew by hand the entire Fleck 5600-SXT control valve from top of tank if it was shipped screwed on. 1. With the the most advanced features and a simple design for easy programming the Fleck 5812 SXT is a "set and forget" system! VALVE POWERHEAD ASSEMBLY 3. This sets the length of the backwash portion of the cycle. Tubing and fittings used to connect the control head to the brine tank. If it extends more than 1/3 inch above the top of the tank please refer to the FAQ section for ways to correct this. Position the valve to the start of the brine tank fill cycle. If you have a lot of iron or very dirty water, set lower. Make sure to follow all applicable local plumbing codes. If you have any plumbing related questions, please direct them to a local plumber. Do not use Teflon tape or other sealants on the threads between the tank and valve. Our Fleck 5812SXT On Demand metered high flow 1 1/4" digital water softener is packed with all of the top available features with the simplest mechanical design at one low price. The brine line can be found by taking the lid off the brine well (the brine well is a 4" diameter white tube that can be found in the brine tank). Since the brine tank has a float designed to stop the tank from overfilling, the most common cause of overfilling is the brine line not being securly connected to the float mechanism. You will need to calculate the gallon capacity of your system (how many gallons the system can go through before it needs to regenerate). Depending on the system there may not be any discoloration, it may clear up almost immediately, or it may take a couple of hours. We show you how to program your machine for max efficiency! If you have KDF media (a very dense goldish or dark brown material) it will be added to the top of the tank. Flow Indicator - Flashes to indicate water is flowing through the system. This will reset all settings to default values, but leaves the volume remaining intact. When flashing a regeneration will run at the programmed time. DO NOT tie multiple systems into a single drain line. Divide hardness in ppm or mg/L by 17.1 to get GPG. The material placed in the polyglass tank that does the actual treatment of the water. For the average home the amount of sodium in the water will add little to your overall sodium intake (a single slice of regular bread will have 3-4 times as much sodium as a typical glass of softened water). Hand tighten only. Time Clock - will regeneration at the set regeneration time after the set number of days has passed. Since every installation is different it's difficult to provide step by step instruction on how to plumb your softener to your existing lines. Plug the power adapter into a wall outlet and let's get started. Normally your water softener will initiate the regeneration automatically based on your water consumption. It is a good idea to dry fit all your connections before cutting into your plubing and finalizing them to ensure everything lines up like it should and that you have everything you need. Place distributor tube in tank if not already inside tank. Simply pour water into the tank until it is 1/4 - 1/3 filled with water. FREE Shipping. System will automatically recover from this state. Please apply these instructions with discretion and common sense. The resin goes in the polyglass tank, DO NOT load the resin in brine tank. The resin is precharged and able to treat the water out of the box. Take the capacity of the system and divide by this number, this is your total capacity. Depending on system size you will also receive the following tank and media/resin: The pilot O-ring is up inside the control head and you will usually have to reach up inside to feel it, it is almost impossible for it to come out. Fleck 5600SXT Downflow Service Manual 42684 Rev G JE11 TABLE OF CONTENTS iron buildup. At this point we suggest adding half a bag of salt to the brine tank. Hold Extra Cycle button while plugging the unit in. This sets the length of the brine draw portion of the cycle. Perform a manual regeneration to reset the error. The SE controller has been discontinued for long enough it would be impossible to send one out anymore. The programming also has major implications to the salt efficiency. If using a softener for iron removal, then the carbon filter will typically follow after the softener. If you are installing more than one tank system the typical order for installation is: Programming the Fleck 5600SXT Meter Valve: • Before start-up a few simple steps must be followed to program the Fleck 5600SXT Meter Valve. Use this Water Softener Capacity Calculator or our Cylinder Calculators to find the capacity of your softener.. Over-tightening the metal clips does not bring the plastic parts closer together, and this over-tightening may damage the plastic softener parts. THANK YOU Thank you for purchasing a new Water Softener from AFWFilters. Each handle is labelled. To ensure proper operation, ensure that the drain line will not collapse or kink, and avoid installing any additional fittings (check valves, ball/gate valves, etc.) Ensure the riser tube slips inside the pilot opening in the bottom of the head. Value Bundles + Limited Time Special Offers + Clearance Items... CLICK HERE TO VIEW! If your brine line is not pushed in the quick connect fitting all the way it will not seal correctly, and this is the most common cause of the brine tank overfilling. Below is a chart with a list of all options shown in the MASTER programming. Fleck 7000 Greensand Installation & Startup Guide Page 7 cleanwaterstore.com Rev051414 Installation Instructions 1. Simply pour … Resin - Used in softeners - Small beads, similar to wet sand, various colors This sets the time that the regeneration cycle will start. For this reason it is important that you pay attention to the resin level as you fill it, typically a fully loaded system will be about 1/2 full. We need to connect a drain line to the Fleck 5600SXT control valve for this purpose. The flow meter connects the control head and the bypass valve and it measures the water flow to initiate regeneration on demand. When the tank is full, open the inlet side of the bypass all the way. To remove the tubing, hold the collet ring that sits around the tubing while pulling the tubing out. We appreciate the opportunity you have given us to provide you with better water. Press and hold either the Up or Down buttons until the 5. Open a nearby COLD faucet and check to ensure there are no leaks that show up when water is running. Only used if water usage does not initiate it first. If the hardness is high enough that you get salt buildup you can use potassium chloride pellets instead to help alleviate the issue. Press the Extra Cycle button to advance to each setting shown below, and adjust with the UP/DOWN buttons if necessary. Check the meter to ensure it is not stuck and that the gallons remaining is counting down. Typically connected to the control head when received. CLICK LINK BELOW Find investment information and connect with Fleck 5600SXT Water Softener Review, a Box Elder, SD, USA based startup. Fleck 5600 Timer Motor Replacement (Fleck Part Number 18743 Replacement), 120v 60Hz 3W. Fill tank partially with water -Optional-, Finish filling tank with water -Optional-, If Present - Inspect and install top distributor basket, Connect overflow to floor drain -Optional-, © 2008-2021 Abundant Flow Water, Inc All Rights Reserved. If you have a second one it can be used on the bottom, but it doesn't really serve purpose and can be saved as a spare if you prefer. Below is a list of what you'll need to purchase, and the tools you'll need to complete the task. Whole house cartridge systems are typically installed after any tank systems, the Scale Sentry system after the cartridge system(s), and any UV systems will be last. Once plugged in, verify the system is receiving power and ensure the outlet is not on a switch that might get turned off. After verifying programming run the system through a regeneration and watch the motor to ensure that it is moving the piston, if it is not the motor needs to be replaced. The display will show the time as currently programmed in the system. Connect the brine line to the float assembly using the instructions for the connection style you have. Hold Extra Cycle and Down buttons for 25 seconds. If error reoccurs, contact us for support. You can, however it is typically not recommended. The bypass valve on your system allows for water to the system to be shut off for service or maintenance without shutting off the entire water supply. Let water run out of the faucet at least 20 minutes (this cleans out the sysetm and ensures everything is flowing correctly), or until any discoloration clears up. Slowly open up the bypass valve just to the point of allowing water to enter the system at a trickle, and leave it like that until the tank is full of water. See end of programming section for error code explainations. Our office hours are Monday-Friday 8:00 AM - 5:00 PM CT, and you can call us at 321-FILTERS (321-345-8377).